Project
Number 4: Mapping
In groups of two, map a scatter of timbers on the
floor of the Ship Lab
using two different methods:
1) triangulation and
2) direct survey measurement (DSM).
First define the parameters of the “site” by mapping
the room and preparing a plan
view of the room that shows the locations of the datums. Then record a sufficient number of
points on each timber so that its
orientation can be accurately determined within the plan view of the site.