Project
Number 4: Mapping
Your two plans (one for triangulation, one for DSM)
are to be drawn at 1:10, must
include a sketch of each timber (with its field number and its measured points clearly
identified), and must
also include the datum points, a north arrow, a metric scale, and a title block. Include, as well, a table
for each plan that
lists the measurements from each datum to each measured point, the measurements taken to map the outline of
the room, and the measurements
between datum points.
The
project is due at the beginning of class in Week 9.